View of North End Zone Screen During Construction

Picture 1 of 3

Florida State University, Tallahassee, Florida

Professional Services:   2008

Constructed:   2008

Project Owner:  Florida State University

As part of a continuing services contract with Florida State University, Rosenbaum Engineering, Inc. provided structural engineering for the design of supporting structures for the installation of a new 24’ by 45’ Video Screen in the south end zone, a replacement 10’ by 24’ Video Screen in the north end zone, new Delay of Game Clocks and approximately 500 feet of four feet high ribbon screens distributed around the stadium. The project included analysis of the existing structure to support the new loadings (including 110 MPH wind loads) and design of all supporting structure and connections. The project also included a Threshold Inspection of the installation phase of the work.